Before pictures of my kitchen.
I am going to knock out the pantry wall (where the McDougall cabinet is) and bring cabinets all the way down then an L-shape bar at the end, about where the window is.
I'll also have a counter and cabinets at the end of the kitchen with corner cabinets at both ends. These at the end will all have glass fronts so I'll have someplace to put my nice Franciscan Desert Rose dishes.
I'm going to put in a slide-in range with an overhead microwave.
It'll be so nice to have counter space and get rid of so much of the clutter!
The kitchen is empty and ready to start!
Sink's in ... and cabinet hardware!
Counter tops are installed! (January 15)
Yay! The kitchen is officially finished!
| This counter and the one at the right is all the counter space I have.
|
![]() |
![]() |
|
![]() |
Day 1 of remodeling --
everything is torn out to the bare walls. |
![]() |
And the wall comes tumbling
down... |
![]() ewwww .... ugly green linoleum that was original to the house. |
![]() |
![]() |
WOW -- what a mess Day 1 was.
I'm sure Day 2 will be much better -- right? At least we have cabinets today! |
![]() |
And one corner cabinet got hung! |
| Oops -- cabinet base is shorter
than old ones -- guess we'll need a new floor! |
![]() The new flooring is laminate that looks like stone tiles. |
| OK -- floor is in. What's
this? Call the plumber and move plumbing over 6 inches so sink can
be centered under window. |
After the plumber and flooring --
electric work had to be done. Rewiring because dishwasher and
stove weren't going in the same place. Any bets on if any cabinets get put in on Day 3 ?? Stay tuned ... |
![]() |
These end cabinets are all
glass doors. The doors to the corner cabinets on each end came
with plain doors and will be re-ordered.
|
| Range goes here and then
base cabinets next to it. The top cabinets were wrong size and had
to be re-ordered.
|
Cabinet far right of window was
wrong size and had to be re-ordered. |
| Still another base cabinet
goes in bottom - left Dishwasher goes in the space bottom - right Mike and I put the shelves in this evening.
|
There will be a drawer base at the
end of the kitchen where the blank space is now. Probably go in
tomorrow. |
| I love the large base corner
cabinets with the lazy susans!
|
Great place to play hide 'n seek! |
| Day
4 -- the guys are working half day and hopefully get the rest
of the cabinets installed. Maybe the appliances can be put
in on Monday and I can at least have a stove. (keeping my fingers crossed)
|
They put almost all of the cabinet doors on.
|
| And getting the cabinets across
the bottom completed
|
There will be glass on the cabinet
fronts on those two corner cabinets, too.
|
| At this end of the kitchen, there
will be a bar/counter going across. Probably long enough for 3 bar
stools.
|
![]() |
| I love these two corner cabinets
with the lazy susans! |
This cabinet with the large pull
out shelves is next to my stove to hold my pots and pans. |
|
Day 5 (Sunday) and I'm suppose to get the
appliances. They'll connect the stove so I can at least cook and put some plywood on the the tops of the cabinets so I can use them until the counters are in. |
WOW -- I have a new window
and a dishwasher!
|
| This is the wall that the
bar/counter will be attached to. Cabinets on the one long side are 15 feet! That's a lot of cabinets! The far end is 10 feet.
|
And I can cook now!
|
| It'll be a couple of weeks before
the cabinet is in. This is where the wrong size one was ordered.
|
And I need a cabinet on the right
side of the window, too. The guys put some plywood on the cabinet tops until I can get counters. It may be a couple of weeks for that. I had a couple of rolls of contact paper left over from 'something' that I put down on it -- just to make it easier to clean.
|
|
Still a lot of small work to be done. Baseboard, trim around windows, paint, etc. Counters should be done in hopefully 2 weeks -- maybe as long as 3 weeks. Then the tile will be done. In the meantime -- the guys will come over and put the knobs on the doors/drawers as soon as I get the ones I want. It's kinda 'roughing it' with no sink in the kitchen, but I'll survive! I'm very happy with what they've done! |
Yay! The guys went ahead and put my sink in so I'd have water in the kitchen. It's going to be about a week - 10 days before my counters will be ready to be installed.
And Saturday Mike and I picked out the hardware for the cabinets and he put those on for me.
|
| New sink and fixtures |
|
| Pull out trash bin -- didn't want
my trash just sitting around in my new kitchen! |
![]() |
![]() |
![]() |
| Counter
tops went in Tuesday 1/15 |
![]() |
![]() |
![]() |
| Started on tile Jan 16 and working
on it today, too. They also put the window sill ledge in. |
![]() |
![]() |
![]() |
![]() |
Yay! The kitchen is officially finished! The guys got the tile grouted and the two glass cabinet doors came in. I'm very pleased with it. And that's an understatement. Trim around kitchen window needs painted -- but I'll do that myself (for anyone that knows me, you know that means Mike will do it). Pictures taken this morning while still dark and I still have lots of things to do to make it really *my* kitchen! Have I mentioned how much I love my boys for doing this? BIG hugs to John (the contractor) and Curtis & Walter (the workers) |
| That basket hanging from the
ceiling is for bird. She was so lost with no place to perch in the
kitchen! |
![]() |
![]() |
I love the pull-outs in this
cabinet for my pots and pans!
|
![]() |
![]() |
| Note how the window is centered
over the sink!
|
![]() |
![]() |
![]() |
| And add a touch of color ...
|
...plus a few collectibles |
| Mike ordered the bar stools on the internet. The red looks great!
|
And although I liked
my red/yellow/blue light fixtures, the bulbs were almost impossible to
find for them. We got new ones.
|